One drawbridge
The town is separated from the mainland by the Intracoastal and reached by a single drawbridge at Commercial Boulevard. That is a scheduling fact for any truck, not a piece of scenery.
Broward County · line answered right now
Dispatch takes the address and notes which side of Pine Avenue it is on, because that street divides two different wastewater arrangements inside a town under a square mile.
Why does one street change who handles the sewer here?
Because the town’s wastewater arrangement genuinely splits at Pine Avenue. Everything north of it is serviced by the City of Pompano Beach. In the southern half the Town of Lauderdale-by-the-Sea maintains the collection system itself, while Pompano still maintains the lift stations and transports the wastewater by force main to the County for treatment.
So a single 0.88 square mile town has three organizations involved in moving its sewage, and which of them matters to you depends on a street. That is worth knowing before a problem rather than during one, because the first call is not the same at both ends of town.
The rest follows from the island. The whole town sits on a barrier strip roughly half a dozen blocks wide with the Atlantic on one side and the Intracoastal on the other, reached by a single drawbridge at Commercial Boulevard.

What is under these houses
A 1920s beach town on a strip of sand with one road onto it.
The town is separated from the mainland by the Intracoastal and reached by a single drawbridge at Commercial Boulevard. That is a scheduling fact for any truck, not a piece of scenery.
North of it, Pompano Beach services the wastewater. South of it, the Town maintains the collection system while Pompano runs the lift stations and moves the flow to the County.
The town incorporated in 1927 and again in 1947, and its architecture is largely mid-century modern, which places most of the housing inside the cast iron era.
Along with Anglin’s Fishing Pier and the SS Copenhagen, wrecked in 1900 and now a listed underwater preserve. It is a small town with an unusual amount of water around it.
From the Intracoastal to the Atlantic. Every property here is close to salt water on both sides, which is what shortens the life of copper supply lines.
How it fails here
Salt on both sides, mid-century pipe, and a split utility.
Six blocks from ocean to Intracoastal means salt reaches supply lines from both directions while water works on them from inside. One pinhole is usually a report on the whole run.
Ask what the rest of the run looks like.
RepipingHousing from the town’s main building period is on cast iron, roughened from the inside so it catches what should pass. Clearing it leaves the cause exactly where it was.
Ask for a camera before a third clearing.
Cast iron replacementWhich organization services the wastewater depends on that street. Knowing which half you are in saves a call to a city that does not handle your end of town.
Have the boundary established first.
Sewer line repairWhere we work
Pine Avenue is the line that matters here.
Serviced by the City of Pompano Beach for wastewater, so the organization to call about a main at this end is a different city entirely from the one at the other end.
The Town maintains the collection system itself here, while Pompano still runs the lift stations and moves the flow onward to the County. One street, two arrangements.
A few blocks from the Intracoastal to the Atlantic, with salt on both sides of every property and a coral reef a hundred yards offshore.
Who owns what
Three organizations for one small town.

Reviews
Real reviews from the company’s own Google Business Profile, quoted with the reviewer’s public name.
77of the 77 reviews captured from the profile are five stars, and none is below five.
Read straight from the Google Business Profile on August 20, 2026. Counted, not estimated.
Open the Google profileMike came and save me the day he replaced my waterheater after It was flooded all over thanks God there is emergency plumbing SFL BIG RECOMANDATION
Moti gave exceptional service ! He arrived quickly and was done less than an hour ! Will use this company again
Had a really slow drain in my bathroom and it was driving me crazy. The guy who came out was super chill and found a bunch of hair and gunk clogging it up. He cleared it out in like 20 minutes, and now it’s draining faster than before! …
Questions
It depends which side of Pine Avenue you are on. North of it, the City of Pompano Beach services the wastewater. South of it, the Town maintains the collection system while Pompano runs the lift stations. We establish which as part of the call.
It is the only way onto the island, so it is a real scheduling factor rather than a piece of scenery. The practical response is taking enough detail on the phone to arrive with the parts a job like yours usually needs.
Because the town is six blocks wide with the Atlantic on one side and the Intracoastal on the other. Salt attacks the outside of the pipe while water chemistry works on the inside, so a pinhole can appear in a run that is not old.
Most of it is mid-century. The town was settled around 1924 and incorporated in 1927 and again in 1947, and its architecture is largely mid-century modern, which puts the drain lines in the cast iron era.
Nearby
One of these is entirely surrounded by this town.
Live dispatch · 24 / 7 / 365
A person answers at any hour, works out which half of town you are in, and routes a plumber over the bridge.
No obligation. Work performed under Florida plumbing contractor license CFC1433655.