The first homes were finished in 1984
In the Country Isles and Windmill Ranch sections of the Arvida development, which makes most housing here forty years old or less.
Broward County · line answered right now
Dispatch takes the address and routes a plumber who knows the water here is Sunrise under contract, which changes who has to permit work on it.
Why is Weston water billed by another city?
Because Weston contracts with the City of Sunrise for water and sewer, and for the billing that goes with it. The Sunrise utility system is regional rather than municipal: it covers about seventy square miles taking in Sunrise, Southwest Ranches, Weston and parts of Davie, and serves more than 215,000 customers.
That has a practical consequence beyond a name on a bill. An engineering permit is required for water or wastewater improvements anywhere inside the Sunrise utility service area, which includes Weston, so work on a supply or sewer line here can need a permit from a city you do not live in.
The other thing to know is the age of the housing. The first homes in the Arvida-developed section were completed in 1984 in Country Isles and Windmill Ranch, and the city itself only incorporated in 1996, so almost nothing here is old enough for cast iron drains.

What is under these houses
Weston is a planned city on the edge of the Everglades, and it is young.
In the Country Isles and Windmill Ranch sections of the Arvida development, which makes most housing here forty years old or less.
The city is made of the Bonaventure and Indian Trace development districts rather than organically grown areas, which is why sections feel uniform inside and distinct from each other.
Weston is the most western city in Broward County and its entire western boundary is next to the Everglades.
Weston contracts with the City of Sunrise for water and sewer and for billing, as part of a utility system covering roughly seventy square miles.
An engineering permit is required for water or wastewater improvements anywhere inside the Sunrise service area, which reaches well past Sunrise itself.
How it fails here
Young housing fails differently, and the utility boundary complicates it.
The oldest sections are now at the age where water heaters, angle stops and braided supply lines reach the end of their service life, and in a phased development they do it together rather than one house at a time.
Replace supply lines before the tank fails.
Water heater replacementWater or sewer work inside the Sunrise utility service area needs a Sunrise engineering permit even though the property is in Weston. It is the kind of thing that stops a job on the morning it was meant to start.
Have the permit route confirmed first.
RepipingAt seven feet against the Everglades edge there is effectively no gradient. Water leaving a line under the slab spreads through fill until the floor lets it up, which is rarely above the break.
Have it located before anything is opened.
Leak detectionWhere we work
Two development districts, built in phases from 1984 onward.
One of the first Arvida sections, with homes completed from 1984, which makes it the oldest pipe in a city that mostly is not old at all.
The other 1984 section, where whole streets reach forty years together and their water heaters and supply fittings arrive at the end of their lives at the same time.
One of the two development districts the city is made from, on the same drained ground against the Everglades edge as the rest of it.
Who owns what
The city is Weston. The utility is Sunrise.

Reviews
Real reviews from the company’s own Google Business Profile, quoted with the reviewer’s public name.
77of the 77 reviews captured from the profile are five stars, and none is below five.
Read straight from the Google Business Profile on August 20, 2026. Counted, not estimated.
Open the Google profileMike came and save me the day he replaced my waterheater after It was flooded all over thanks God there is emergency plumbing SFL BIG RECOMANDATION
Moti gave exceptional service ! He arrived quickly and was done less than an hour ! Will use this company again
Had a really slow drain in my bathroom and it was driving me crazy. The guy who came out was super chill and found a bunch of hair and gunk clogging it up. He cleared it out in like 20 minutes, and now it’s draining faster than before! …
Questions
Because Weston contracts with the City of Sunrise for water and sewer, and for billing. The Sunrise utility is regional, covering around seventy square miles across four jurisdictions, so the city that governs your street and the city that owns your water main are different.
For work on water or sewer, yes. An engineering permit is required for improvements anywhere inside the Sunrise utility service area, which includes Weston, so it can involve a city you do not live in. Building permits stay with Weston.
Not cast iron. The first homes were completed in 1984 and the drains are PVC, so what reaches the end of its life first is everything attached to the pipe: the water heater, the angle stops and the braided supply lines.
For plumbing, mainly through the ground. This is flat, drained land at seven feet, so there is no gradient for escaping water to follow and a slab leak surfaces wherever the floor gives rather than above the break.
Nearby
Two of these share the same utility.
Live dispatch · 24 / 7 / 365
A person answers at any hour, walks you through shutting the water off, and a plumber is routed to the address.
No obligation. Work performed under Florida plumbing contractor license CFC1433655.